Page 1: an article and photograph about the Georgia Press Association, with offices on the 6th floor of the Atlanta Division BuildingPage 5: an article and photograph about the biology department and its collection of skeletons and live specimens
An article about organizations in the Atlanta Division Building outside the school operations, such as the State Merit System, the Hospital Association, and the Georgia Press Association (6th floor).
An article about the Atlanta Division library, with spaces on the 1st and 6th floors. The business library was moved to the 6th floor in May 1950, and contained economics, business art, and music periodicals. The article includes a list of…
An article about fireproofing in the Ivy Street Building, also called the Atlanta Division or AD Building. Measures include a firewall next to the Hurt Grill and the paint shop on the 6th floor. The article mentions Jack Stone, building custodian.
An article about the improvements in fire satefy throughout the Ivy Street Building, including panic bars on exits, safety rails along the ramps, and automatic fire alarm boxes.
Page 8: a photograph of the Atlanta Division concert band practicing on the 6th floor of the Ivy Street BuildingPage 9: an article about Mamie Herd, elevator operator in the Ivy Street Building, and her experiences
Page 4: an article with updates about the rooftop "campus in the sky" project, which has stalled as engineers seek a material that would provide waterproof covering and serve as a dancefloor.Also, an advertisement for "Georgia Belt Buckles" sold in…
Page 5: an article about the plans for the rooftop "campus in the sky" with temporary beach, tennis and badminton courts, shuffleboard, and a dancing floor. Hopes for a swimming pool were dashed when engineers determined the weight would be too much…
Page 1: completed renovations on the 7th floor penthouse provides a space for student activities, which Coach Herbert Burgess suggests is better suited for dances and socials than the school gymPage 5: the renovations to the 6th floor include the new…
An article about the work being done on the 5th, 6th, and 7th floors. Director Sparks announced a new assembly hall on six, where the Atlanta Symphony Orchestra would rehearse, having previously rehearsed in a room on the 3rd floor. The 7th floor…
An article about the Anderson Clayton Company vacating its rooms on the 6th and 7th floors. Director Sparks commented that plans include new music and art studios.